Westland Water District PP7-1 Efficiency Improvements
MKN provided construction management services for improvements to a low-flow booster pump at the existing canal lateral 7-1 pump station to improve pumping efficiency during periods of low demand.
Read More >
City of Tehachapi Hydraulic Modeling, Master Planning, and CIP Development
MKN completed an evaluation of existing water production, storage capacity, and performance of distribution facilities.
Read More >
Five Wells Arsenic Treatment Project
MKN designed arsenic removal systems for five key groundwater production wells for the City of Bakersfield.
Read More >
Margarita & Foothill Lift Station Replacement
MKN designed multiple new fiberglass wetwell sewer lift stations for the City of San Luis Obispo to replace aging infrastructure, improve reliability, and and increase operator safety.
Read More >
City of Santa Paula Staff Augmentation
MKN serves as staff extension for the City, monitoring the contract operator to ensure that all aspects of the contract are met.
Read More >
California Rail Builders Utility Relocation
MKN was retained by the CRB design-build team to lead the effort of relocating multiple water infrastructure elements within SWID and NKWSD.
Read More >
East Niles Community Services District Engineering
MKN serves as District Engineer. District Engineer responsibilities range from planning to detailed design.
Read More >
Los Osos Basin Management Committee Los Osos Creek Groundwater Recharge Study
The Basin Management Committee (BMC) hired MKN to prepare a Feasibility Study to investigate permitting and technical feasibility of discharging recycled water from the Los Osos WRF to the nearby Los Osos Creek.
Read More >
Morro Bay Water Reclamation
MKN provided critical program management services for this $150M+ project to replace their existing wastewater treatment plant with an advanced water purification facility.
Read More >
City of Morro Bay/Cayucos Major Maintenance and Repair Program
MKN’s efforts have resulted in cost-effective improvements to keep the plan in operation while minimizing investment in “short-term” infrastructure.
Read More >