MKN provided construction management services for improvements to a low-flow booster pump at the existing canal lateral 7-1 pump station to improve pumping efficiency during periods of low demand.
MKN completed an evaluation of existing water production, storage capacity, and performance of distribution facilities.
MKN designed arsenic removal systems for five key groundwater production wells for the City of Bakersfield.
MKN designed multiple new fiberglass wetwell sewer lift stations for the City of San Luis Obispo to replace aging infrastructure, improve reliability, and and increase operator safety.
MKN serves as staff extension for the City, monitoring the contract operator to ensure that all aspects of the contract are met.
MKN was retained by the CRB design-build team to lead the effort of relocating multiple water infrastructure elements within SWID and NKWSD.
MKN serves as District Engineer. District Engineer responsibilities range from planning to detailed design.
The Basin Management Committee (BMC) hired MKN to prepare a Feasibility Study to investigate permitting and technical feasibility of discharging recycled water from the Los Osos WRF to the nearby Los Osos Creek.
MKN provided critical program management services for this $150M+ project to replace
their existing wastewater treatment plant with an
advanced water purification facility.
MKN’s efforts have resulted in cost-effective improvements to keep the plan in operation while minimizing investment in “short-term” infrastructure.