Water Replenishment District of Southern California – PFAS Water Treatment Remediation Program

MKN completed a remediation program including management of documents and preparation of documents. MKN coordinated with the WRD to treat the water that was in exceeding in maximum contaminant levels
Read More >

Westland Water District PP7-1 Efficiency Improvements

MKN provided construction management services for improvements to a low-flow booster pump at the existing canal lateral 7-1 pump station to improve pumping efficiency during periods of low demand.
Read More >

City of Tehachapi Hydraulic Modeling, Master Planning, and CIP Development

MKN completed an evaluation of existing water production, storage capacity, and performance of distribution facilities.
Read More >

Five Wells Arsenic Treatment Project

MKN designed arsenic removal systems for five key groundwater production wells for the City of Bakersfield.
Read More >

Margarita & Foothill Lift Station Replacement

MKN designed multiple new fiberglass wetwell sewer lift stations for the City of San Luis Obispo to replace aging infrastructure, improve reliability, and and increase operator safety.
Read More >

City of Santa Paula Staff Augmentation

MKN serves as staff extension for the City, monitoring the contract operator to ensure that all aspects of the contract are met.
Read More >

California Rail Builders Utility Relocation

MKN was retained by the CRB design-build team to lead the effort of relocating multiple water infrastructure elements within SWID and NKWSD.
Read More >

East Niles Community Services District Engineering

MKN serves as District Engineer. District Engineer responsibilities range from planning to detailed design.
Read More >

Los Osos Basin Management Committee Los Osos Creek Groundwater Recharge Study

The Basin Management Committee (BMC) hired MKN to prepare a Feasibility Study to investigate permitting and technical feasibility of discharging recycled water from the Los Osos WRF to the nearby
Read More >

Morro Bay Water Reclamation

MKN provided critical program management services for this $150M+ project to replace their existing wastewater treatment plant with an advanced water purification facility.
Read More >